From yarn to packaging, all under one roof
From Concept to Shelf.
With 410 knitting machines and a 140-person team, a monthly capacity of 1.8 million pairs at our 5,000 m² vertically integrated facility in Mersin.
[ PRODUCTION PROCESS ]
98%
On-Time Delivery Rate
START
Our critical yarn stocks are always kept ready. The moment an order is confirmed in the system, the production line starts running without waiting for raw materials.
CONCURRENCY
While the production line runs, packaging and labeling approvals are completed in parallel. By preventing processes from waiting on one another, operational time loss is reduced to zero.
FACILITY FLOORPLAN






5,000 m² · 6 floors · Mersin
MACHINE PARK & EQUIPMENT INVENTORY
[ PROD / LONATI 615 GL — SINGLE CYLINDER ]
[ TOPLAM: 303 ]
96N · 14 gauge · 3½″
24 pcs
In Active Production
108N · 14 gauge · 3½″
15 pcs
In Active Production
120N · 14 gauge · 3¾″
24 pcs
In Active Production
132N · 14 gauge · 3¾″
15 pcs
In Active Production
144N · 14 gauge · 3¾″
75 pcs
In Active Production
156N · 14 gauge · 3¾″
100 pcs
In Active Production
200N · 18 gauge · 3¾″
50 pcs
In Active Production
[ PROD / KOMET — DOUBLE CYLINDER ]
[ TOPLAM: 107 ]
40N · 3 gauge · 3½″
10 pcs
In Active Production
64N · 6 gauge · 3½″
10 pcs
In Active Production
84N · 6 gauge · 4½″
27 pcs
In Active Production
132N · 9 gauge · 4″
40 pcs
In Active Production
160N · 14 gauge · 3½″
20 pcs
In Active Production
[ PRODUCTION LINE ]
[ QUALITY CONTROL CRITERIA ]
Incoming yarn conformity certificate, color matching, tensile-tear resistance and certificate traceability.
At the knitting machine — pattern accuracy, stretch and length measurement, scanning for streaks/skips/runs/cuts.
Smoothness of the seam line, density of stitches, calibration along the toe line.
Form and size accuracy, label placement, packaging integrity.
Pre-logistics label, barcode and shipping waybill conformity approval.
INTEGRATE INTO OUR PRODUCTION NETWORK
Get in touch to connect your operation to our hardware infrastructure with a monthly capacity of 1.8M pairs, and to evaluate capacity availability and on-site audit options together.